Sunday, 15 December 2013

Production log 14

                                                     Blog reflection 14

This week we was focusing on the music video still as the class was given more time and as we was  let down by our actor a number of times we didn't have enough footage which meant we had to use our contingency plan which was use me as the actor and the singer in the music video, this meant that we had to start from scratch which meant that all the editing that we previously had done had tobe deleted and we had to re plan our music video within the time we had . We decieded that as we didnt have allot of time that we should film using the green screen as it gives us more filming time as the days was getting darker quicker which meant we didn't have much filming time. We also had to shoot the scene of the artist(me ) with the actress who was playing our female role.

Once we had filmed these scenes it had not left us long as the next day we had to edit the entire music video again as it was the deadline day which meant that the music video wasn't to the best of me and my partners ability however we still included the synergy and considered our target audience which helped us with the locations that we chose at the time.

We also had to start our advertisement and digi paks products at the end of this week which me and my partner are confident with and have a strong plan of what i am going to be doing as our plan was clear and the synergy is very clear which made it much easier to create both products.

Sunday, 8 December 2013

Production log 13

                                                                     Production log 13



This week our class had to analyse each of theirs three products and tell us our strengths and weaknesses on a feedback sheet which allowed to see what we could include in our evaluation and see whether we hit our target audience and how effective our ancillary products were.






Sunday, 1 December 2013

Production log 12

                                                       Production log 12

This week was deadline week for our music video, I think that our music video was good however we could planned better and used better actors as our actors let us down frequently which put us in a difficult position and lead to me and my partner using our contingency plan which was to use me as the male actor and artist.
We also had to edit most of the footage on the deadline day as we reshot our footage for the music video a day before as we had to change our plans therefore we was under pressure for our editing therefore I don't believe that the music video is at its best due to this however still applies to our target audience and uses the same themes that we wanted to however we didn't conform with the typical types of actors however like mentioned above this was out of our hands at this point.

I also started to create the advertisement of our music video first which wasn't as difficult as expected as we had a clear plan of what we wanted therefore could take control. For the advertisement i used Photoshop as I am more familiar with the system them fire fox and had used it successfully in the past.