Sunday, 15 December 2013

Production log 14

                                                     Blog reflection 14

This week we was focusing on the music video still as the class was given more time and as we was  let down by our actor a number of times we didn't have enough footage which meant we had to use our contingency plan which was use me as the actor and the singer in the music video, this meant that we had to start from scratch which meant that all the editing that we previously had done had tobe deleted and we had to re plan our music video within the time we had . We decieded that as we didnt have allot of time that we should film using the green screen as it gives us more filming time as the days was getting darker quicker which meant we didn't have much filming time. We also had to shoot the scene of the artist(me ) with the actress who was playing our female role.

Once we had filmed these scenes it had not left us long as the next day we had to edit the entire music video again as it was the deadline day which meant that the music video wasn't to the best of me and my partners ability however we still included the synergy and considered our target audience which helped us with the locations that we chose at the time.

We also had to start our advertisement and digi paks products at the end of this week which me and my partner are confident with and have a strong plan of what i am going to be doing as our plan was clear and the synergy is very clear which made it much easier to create both products.

No comments:

Post a Comment